Skip to content
Monday – Friday: 7:00 am – 5:00 pm · Saturday – Sunday: ClosedMonday – Friday: 7:00 am – 5:00 pmClass A Air Conditioning Contractor · FL Lic. 000000VerifyLiability and workers' comp · Your insurance carrier · Policy 000000
1 more license
  • Class A Air Conditioning Contractor · FL Lic. 000000Verify
  • Liability and workers' comp · Your insurance carrier · Policy 000000
(239) 555-0103

Service

Controls and logs

Building controls, trend logs and alarms, so a problem reaches the manager before it reaches a resident.

Signs it's time to call

  • Setpoints nobody can explain

  • Alarms that go to a phone nobody carries

  • A plant that runs all night with no one in the building

  • Controls parts that are no longer made

Rooftop exhaust fan and condenser above a brick wall

At the visit

What happens, in order.

  1. 01

    Step 1: Read the controls

    We log in with your engineer and note setpoints, schedules and overrides.

  2. 02

    Step 2: Pull the trend logs

    Run hours, temperatures and alarm history go into the record.

  3. 03

    Step 3: Fix the obvious

    Wrong setpoints and stuck overrides are corrected, with the manager's say-so.

  4. 04

    Step 4: Route the alarms

    Alarms go to the people who can act on them, with a name on each.

What moves the cost

What drives the price of this work.

No prices on this site. The packet prices each scope line and states how long the prices hold.

  • Age of the system

    Older controllers cost more to keep and are harder to get parts for.

  • Number of points

    Sensors, valves and drives tied into the controls.

  • Remote access

    Whether the building has a safe way to reach the controls.

  • Integration

    Whether controls from different years talk to each other.

  • Training

    How many people at the building need to use them.

  • Documentation

    Whether drawings and sequences exist, or have to be written.

Questions

Questions about this work

Do you replace controls?

Yes, in phases, so the plant keeps running. A replacement is a packet like any other project.

Who owns the logs?

The association does. We keep copies in the equipment record.

Can the manager see alarms?

Yes. We set the routing with the manager and test it with them.

Ask for a walkthrough.

Tell us the building and the machine. We'll set a time with your manager.